Stone World logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Stone World logo
  • NEWS
  • PRODUCTS
    • Machinery
    • Digital Technology
    • Tooling & Accessories
  • MATERIALS
    • Alternative Surfaces
    • Stone
    • Tile
    • Imports & Exports Data
  • FABRICATORS
    • Fabricator How-to
    • Fabricator Case Studies
    • Fabricator of the Year
  • A&D
    • Installation & Technical Tips
    • Outdoor Design
    • Interior Design
    • Hospitality | Commercial Design
    • Mosaics & Decorative Tile
    • Kitchen & Bath
    • Residential
    • Renovation | Restoration
  • MEDIA
    • Videos
    • Podcasts
    • EBOOK
  • EVENTS
    • STONE INDUSTRY EDUCATION
    • Industry Calendar
  • MORE
    • NEWSLETTERS
    • WOMEN SPOTLIGHT
    • MARKET RESEARCH
    • STONE WORLD STORE
  • DIRECTORY
    • TRADE ASSOCIATIONS
    • Stone Suppliers
    • GET LISTED
  • EMAG
    • eMagazines
    • Archives
    • Contact
    • Advertise
  • SIGN UP!
Stone & Tile: Architecture Design & TrendsInstallation & Technical Tips

CTEF Tile Tip: Unique Challenges on the Job Site

By Scott Carothers
transition to adjoining ramp
Image Credit: Scott Carothers
Because this ramp was short by 22 in., the installer had to make some creative cuts in order to make a transition without any tile lippage.
August 7, 2019

Qualified labor—those tile installers who provide and exemplify high-quality work on every job—does exist and is flourishing. Unfortunately, the mediocre installers often get the spotlight due to their substandard installation practices at a super-cheap price.

The Tile Council of North America (TCNA) Handbook explains why choosing qualified labor is important: “Because tile is a permanent finish, the lowest bid should not be the driving factor, but rather who is the most qualified to perform the scope of the work specified.”

Many tile projects can provide installation challenges that require the talent and expertise of better installers. As seen in the attached photo, the installer was presented with a unique situation in a new hotel which should have been addressed and eliminated by the architect or design professional.

The floor surface in the hallway leading from the hotel rooms is 9 in. higher than the adjacent lobby, which necessitated a ramp that met ADA guidelines. Unfortunately, the beginning of the downward-sloping ramp (shown in the red oval) did not begin at the end of the hallway wall; rather, it was 22 in. short, which required the installer to incorporate some creative cuts in order to make the transition without any tile lippage.

There is no specific language in the ANSI Specification that addresses this situation. It does however provide guidance for ramps in A108.01 section 3.2.3.1 which states, “Changes in level greater than 1/2 in. shall be accomplished by means of a ramp. The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12.” This means that for every 12 in. of horizontal dimension, the vertical may only rise 1 in. On this job, the ramp extended 9 ft. and rose 9 in. which meets this requirement.

This well-done transition required the installer to incorporate six wedge-shaped cuts of various sizes within the 12- by 24-in. space. Each cut changes the direction of the slope while still addressing the next tile, with no lippage. This installation needed great tile skills and patience along with a dose of geometry to make all the parts of this puzzle fit together properly.

While this situation should not have occurred, it is proof that good work does exist and talented tile people are doing it every day. Kudos to this installer for making the best of a bad design and putting their expertise to use.

This article was originally posted on www.floortrendsmag.com.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Scott carothers 2025

Scott Carothers is the Academic Director of the Ceramic Tile Education Foundation (CTEF) headquartered in Mt. Juliet, Tennessee (Nashville area). In 2007, he was hired and tasked with creating the Certified Tile Installer (CTI) program, and in 2012, he was part of the team that created the Advanced Certifications for Tile Installers (ACT) program.

For eighteen years, he has been providing training and education to others in the tile industry. Carothers has been involved in the ceramic tile industry for over 44 years and was the owner of a successful retail store and installation firm prior to coming to CTEF.

Carothers served as President and Chairman of the Board of the National Tile Contractors Association (NTCA), Chairman of the NTCA Technical Committee, named the NTCA Tile Person of the Year in 2005, and received the NTCA Ring of Honor in 2013. He is a voting member of the American National Standards Institute (ANSI), the Tile Council of North America (TCNA) Handbook, and NTCA Technical Committees.

Scott has authored over 185 articles in tile industry print magazines including Floor Covering Installer, Tile, TileLetter, and eMagazine/Newsletter publications such as Floor Trends & Installation and TIleLetter along with covering numerous topics on the CTEF Blog, thereby sharing his knowledge and installation experience with his readers. Additionally, he recently retired from being a presenter and trainer for the NTCA Workshop and Regional Training programs and the NTCA Technical Hotline.

He may be contacted at scott@tilecareer.com or 864-222-2131.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • customer doing research online

    3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

    Your fabrication shop can have the best website. The best...
    Fabricator How-to
    By: Anthony Milia
  • Silica

    Renewed National Attention Ignites Over Silicosis Epidemic

    A major investigative report published on March 12, 2026...
    Industry Insights
    By: Jason Kamery
  • shipping containers

    U.S. Countertop Material Imports: February 2026

    U.S. countertop material imports collapsed in February...
    Stone
    By: Jason Kamery
Manage My Account
  • eMagazine
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Popular Stories

cal osha

Cal/OSHA Standards Board to Vote May 21 on Engineered Stone Ban Petition

shipping containers

U.S. Countertop Materials Imports: March 2026

kitchen

Building a Reputation on Strong Craftsmanship and Customer Service

Fabricator Focus

From profiles to roundtable discussions, Q&As to best business practices, we're turning a focus on topics and challenges impacting fabricators.

AI Talk Is Everywhere -- Where Does a Countertop Fabricator Begin?

Fabricators Discuss Pros and Cons of Chip Repair

How to Grow a Countertop Fabrication Shop

Events

June 25, 2026

North Carolina Stone Summit

You’ve probably heard a lot lately about how to calculate the profit for each job you produce. You likely have production benchmarks based on square footage since it’s the most common production metric in the industry. Come learn how focusing on these metrics can hurt your profitability and what to do about it.

July 16, 2026

Washington Stone Summit

Join us for "Taking Your Organization to the Next Level," a session dedicated to transforming your business practices. Discover strategies for setting clear agendas, encouraging participation, and driving actionable outcomes. Learn how to foster collaboration and communication, ensuring that every meeting enhances productivity and contributes to your business goals.

View All Submit An Event

Poll

Tariffs and Quartz Imports

If high tariffs are placed on U.S. quartz imports, how will this affect your business?
View Results Poll Archive

Products

Restoration & Maintenance Technical Module

Restoration & Maintenance Technical Module

See More Products
	
3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

Related Articles

  • CTEF Tile Tip: When the Subfloor is Cracked, Who Pays for the Solution?

    See More
  • poor tile installation

    CTEF Tile Tip: Tile Industry Standards Are There to Help You

    See More
  • CTEF Tile Tip: What is Growing on My Tile?

    See More

Related Products

See More Products
  • thetilebook

    The Tile Book: HISTORY, PATTERN, DESIGN

  • Tile Style for the Home

See More Products

Related Directories

  • Job Well Done

    Job Well Done is field service software built for the countertop industry. The software captures information at the job site (pictures, signatures, issues) and communicates that to the office.
×

Our Newsletters are a rock solid source of industry insights!

Stay in the know on the international stone and tile industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing