Stone World logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Stone World logo
  • NEWS
  • PRODUCTS
    • Machinery
    • Digital Technology
    • Tooling & Accessories
  • MATERIALS
    • Alternative Surfaces
    • Stone
    • Tile
    • Imports & Exports Data
  • FABRICATORS
    • Fabricator How-to
    • Fabricator Case Studies
    • Fabricator of the Year
  • A&D
    • Installation & Technical Tips
    • Outdoor Design
    • Interior Design
    • Hospitality | Commercial Design
    • Mosaics & Decorative Tile
    • Kitchen & Bath
    • Residential
    • Renovation | Restoration
  • MEDIA
    • Videos
    • Podcasts
    • EBOOK
  • EVENTS
    • STONE INDUSTRY EDUCATION
    • Industry Calendar
  • MORE
    • NEWSLETTERS
    • WOMEN SPOTLIGHT
    • MARKET RESEARCH
    • STONE WORLD STORE
  • DIRECTORY
    • TRADE ASSOCIATIONS
    • Stone Suppliers
    • GET LISTED
  • EMAG
    • eMagazines
    • Archives
    • Contact
    • Advertise
  • SIGN UP!

Resurrected from stone ruins

By Jennifer Richinelli
October 10, 2001
The exterior granite facade of the former Grace-Hampden Methodist Episcopal Church in Baltimore, MD, was cleaned with SureKlean by ProSoCo. Additionally, a new roof of Vermont slate was installed.


The front exterior stonework was repointed, and any repairs were made with existing granite pieces that were found in the basement of the building. The building is now occupied by Gilden Integrated, a marketing agency.
After standing as a prominent piece of Baltimore architecture for 100 years, the Grace-Hampden Methodist Episcopal Church was destroyed by a four-alarm fire in January 1999. Further damage was done while the building sat vacant and exposed to winter elements for a period of time following the incident. As of this spring, however, the structure and stonework of the former church was not only restored, but the building also fulfilled the requirements to be listed on the list of Baltimore City historic landmarks and has applied to be recognized on the National Register of Historic Places.

"The church was completed around the turn of the century," said Project Designer Mark Treon of Ziger/Snead in Baltimore, MD. "Half [of the building] was a sanctuary and the other half was used as a Sunday school. Between the two buildings was a space with big sliding doors." The designer explained that the church was built by a local architect, George C. Haskell, who had designed about 20 other buildings in the Baltimore area. "He was a notable architect for that time," said Treon.

According to the designer, the fire started on the first floor in the middle of the building. "The original fire damage was to the roof and a lot of stained glass," he said. "The fire blew out the stained glass, so the church was very open to the elements. A lot of rain and snow got in there, and birds were living in it."

In the fall of 1999, Gilden Integrated, a marketing agency dedicated to the technology industry, purchased the property from the Apostolic Truth Tabernacle congregation, which had occupied the building for 15 years. "The owner came to us and said that they wanted to use historic credits for the project," said Treon, explaining that to do this, the building either had to be in an historic area or on the National Register of Historic Places. Because the building met neither requirement, an historic consultant was hired to research the situation.

"We went with the argument that the building was designed by a famous local architect," said Treon. "That had a big impact in making the historic requirements." And once the building was recognized as an historic piece of architecture, that affected the way the restoration was handled, according to the designer.

Although the interior layout is contemporary, the classic detailing of the exterior reads through including the stained glass and some exposed stone walls.

Assessing the damage

The exterior of the building is believed to be comprised of a locally quarried Falls Road granite. "It definitely was very dirty," said Treon. "I don't know if it was ever cleaned in 100 years. There was a lot of grime on it and the mortar joints were in pretty bad shape." The architect explained that in past renovation work new mortar had been pressed on top of the original mortar instead of removing the original mortar first. In other areas, the mortar had gaping holes.

"We started to investigate how to clean the stone to meet the historic credits," said Treon. "We tried several cleaning methods and used the one which was least damaging to the stone. We tried three or four different scenarios -- starting with soap and water."

Treon said that they let the samples sit for a couple of weeks, while they determined what would be the most effective method of cleaning. In addition to considering what cleaned the stone the best, they also looked at how much time and effort each method required. "Simple water didn't take the dirt off," he said. In the end, SureKlean by ProSoCo was used to clean the granite.

The cleaning process took approximately four months to complete, according to Gary Cartwright of Coastal Exteriors, which was the subcontractor for the project. He explained that the walls were first wet down using 600 psi. The next step was to apply SureKlean to the granite and let it soak in for about three minutes. The walls were then sprayed down using 600 psi.

For the mortar, a spec had to be written that met the historic requirements. "We made sure nothing unusual like oyster shell was in the mortar," said Treon. "We repointed the entire front facade. On the other three facades we patched holes." According to Cartwright, a type N Flamigo mortar was used for the job.

It was believed that the granite was taken from a local quarry. "The contractor thought the granite was local from the Jones Falls area -- a mile or so from the church," said Treon. "There's a valley that runs through there." For the restoration, it wasn't necessary to use any new granite. "Anything that we replaced we used existing stone," said the architect. "We found stone in the basement that had fallen throughout the structure."

In total, a crew of about 10 worked on the restoration. Besides cleaning the granite exterior, they also replaced the roof with Vermont slate. The project was completed in June of this year.

Credit Box

Gilden Integrated Headquarters

(formerly Grace-Hampden Methodist Episcopal Church)

Baltimore, MD

Owner: Gilden Integrated, Baltimore, MD

Architect: Ziger/Snead, Baltimore, MD

General Contractor: Hencken & Gains, Baltimore, MD

Subcontractor: Coastal Exteriors

Restoration Cleaning Products Supplier: ProSoCo, Lawrence, KS

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Jenniferrichinelli 200px

Launching her career with BNP Media in 1996, Jennifer Richinelli is the Editor-in-Chief of Stone World, a leading publication serving the global stone and tile industry. With a strong background in journalism and trade publishing, she oversees the magazine’s editorial direction, delivering in-depth coverage of industry trends, innovative technologies, architectural applications and breaking industry news.

Throughout her career, Jennifer has built a reputation for connecting industry professionals with valuable insights, highlighting the work of fabricators, designers, architects and other industry leaders. Known for her thoughtful editorial voice and commitment to quality content, Jennifer continues to play a vital role in shaping conversations within the stone industry while fostering a platform that celebrates craftsmanship, innovation and design excellence.

In 2010, the Spanish Ceramic Tile Manufacturers’ Association (ASCER) awarded Jennifer with the International Journalism Award for her extensive coverage of the Spanish tile industry. Additionally, she was the recipient of the 2026 Coverings Champions People’s Choice Award.

email: richinellij@bnpmedia.com | office: (201) 245-5204

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • customer doing research online

    3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

    Your fabrication shop can have the best website. The best...
    Fabricator How-to
    By: Anthony Milia
  • Silica

    Renewed National Attention Ignites Over Silicosis Epidemic

    A major investigative report published on March 12, 2026...
    Industry Insights
    By: Jason Kamery
  • shipping containers

    U.S. Countertop Material Imports: February 2026

    U.S. countertop material imports collapsed in February...
    Stone
    By: Jason Kamery
Manage My Account
  • eMagazine
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Popular Stories

shipping containers

U.S. Countertop Material Imports: February 2026

Save Quartz Jobs Coalition Logo

ITC Moves Towards New Quartz Import Tariffs

cal osha

Cal/OSHA Standards Board to Vote May 21 on Engineered Stone Ban Petition

Fabricator Focus

From profiles to roundtable discussions, Q&As to best business practices, we're turning a focus on topics and challenges impacting fabricators.

AI Talk Is Everywhere -- Where Does a Countertop Fabricator Begin?

Fabricators Discuss Pros and Cons of Chip Repair

How to Grow a Countertop Fabrication Shop

Events

June 25, 2026

North Carolina Stone Summit

You’ve probably heard a lot lately about how to calculate the profit for each job you produce. You likely have production benchmarks based on square footage since it’s the most common production metric in the industry. Come learn how focusing on these metrics can hurt your profitability and what to do about it.

July 16, 2026

Washington Stone Summit

Join us for "Taking Your Organization to the Next Level," a session dedicated to transforming your business practices. Discover strategies for setting clear agendas, encouraging participation, and driving actionable outcomes. Learn how to foster collaboration and communication, ensuring that every meeting enhances productivity and contributes to your business goals.

View All Submit An Event

Poll

Tariffs and Quartz Imports

If high tariffs are placed on U.S. quartz imports, how will this affect your business?
View Results Poll Archive

Products

Restoration & Maintenance Technical Module

Restoration & Maintenance Technical Module

See More Products
	
3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

Related Articles

  • Illinois fabricator pursues alternative avenues

    See More
×

Our Newsletters are a rock solid source of industry insights!

Stay in the know on the international stone and tile industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing