Stone World logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Stone World logo
  • NEWS
  • PRODUCTS
    • Machinery
    • Digital Technology
    • Tooling & Accessories
  • MATERIALS
    • Alternative Surfaces
    • Stone
    • Tile
    • Imports & Exports Data
  • FABRICATORS
    • Fabricator How-to
    • Fabricator Case Studies
    • Fabricator of the Year
  • A&D
    • Installation & Technical Tips
    • Outdoor Design
    • Interior Design
    • Hospitality | Commercial Design
    • Mosaics & Decorative Tile
    • Kitchen & Bath
    • Residential
    • Renovation | Restoration
  • MEDIA
    • Videos
    • Podcasts
    • EBOOK
  • EVENTS
    • STONE INDUSTRY EDUCATION
    • Industry Calendar
  • MORE
    • NEWSLETTERS
    • WOMEN SPOTLIGHT
    • MARKET RESEARCH
    • STONE WORLD STORE
  • DIRECTORY
    • TRADE ASSOCIATIONS
    • Stone Suppliers
    • GET LISTED
  • EMAG
    • eMagazines
    • Archives
    • Contact
    • Advertise
  • SIGN UP!
Stone & Tile ProductsIndustry InsightsStone & Tile EventsHospitality | Commercial DesignMosaics & Decorative TileKitchen & Bath

Unique hospital design presents installation challenge

January 8, 2013
After a two-year construction project, the Palomar Medical Center West in Escondido, CA, has brought a breath of fresh air to the medical facility. Situated on a 52-acre site, the 11-story, state-of-the-art healthcare facility is designed to accommodate 360 patient beds, 12 operating rooms, a trauma center and a nursing tower with a diagnostic and treatment wing.

The new hospital is notable for its sustainable design. It was built with recycled and renewable materials, and it uses a minimal amount of water and electricity. Special features are designed to enhance a healing environment, including a 1.5-acre “living roof” and terrace of drought-resistant native plants located above the surgery, cardiology and interventional radiology suites. The green roof is also designed to deflect light and heat to provide a natural cooling system for the facility.

Wirtz Quality Installations, Inc. of San Diego was awarded the contract to handle all internal and external tile and stone installation. “This was certainly a high-profile opportunity for us — and one of the largest and most intricate we’ve undertaken,” said Amber Fox, president of Wirtz, “The project required more than 70 people working five days a week, plus many Saturdays. Logging more than 87,000 man-hours over 15 months took a well-coordinated team.”

The overall project incorporated 20 different types of finish material, including three types of glass tile, nine different porcelains, four types of stone tiles and over 165 tons of natural stone. The 45,000 square feet of lobby and corridor flooring consists of a porcelain tile with three different sizes that creates an intricate pattern that only repeats every 153 square feet.

“The biggest part of the job was the 288 patient toilet/shower rooms that rival most of the finest resorts,” explained Fox. “The rooms measure 8 x 9 feet with a radius wall, bench and shower floor without any curbs. The complete room was tiled, with the exception of the ceiling. We took on this job starting at the studs, created the very critical pitch to the drains and then waterproofed the floors using Custom Building Product’s RedGard® Waterproofing and Crack Prevention Membrane. All floors had to pass a 24-hour flood test before we could continue. There were a total of five inspections that every patient bathroom had to pass before any tile could be installed.”

“Finding the right combination of products that factored in all the variables was essential,” said Devin Dickey, Custom Building Products’ Territory Manager. “We worked closely with Wirtz to determine the best and most efficient way to install the variety of different items that were required for the job.”

A broad range of Custom products were selected, including CEG-Lite™ 100% Solids Commercial Epoxy Grout, which was chosen for all patient rooms and the kitchen and cafeteria areas because of its 100% stain resistance and its recycled content, which contributes to LEED® Certification. Among other products used in the installation are RedGard® Waterproofing and Crack Prevention Membrane, Prism® SureColor® Grout, ProLite® Rapid Setting Large Format Tile & Stone Mortar and Commercial 100% Silicone Caulk.

“The scope of this project was massive,” said Dickey. “It’s one of the largest privately funded construction projects we’ve seen in a long time. And it has required the involvement of virtually every department at our company — from our research lab to product and technical support to marketing and sales. Custom has been integrally involved with every phase of this project, including product recommendations, technical specifications, LEED® Certification and on-site job visits.”

Palomar Medical Center West 

Job Conditions:

• Variety of materials to install — three types of glass tile, nine different porcelains, four types of stone tile and over 165 tons of natural stone

• Green building — project had to meet LEED standards

• Complete construction of bathrooms — pitch of drains had to be built in and floors needed to be waterproofed

Products used:

• Custom RedGard® Waterproofing and Crack Prevention Membrane

• Custom CEG-Lite™ 100% Solids Commercial Epoxy Grout (with recycled content)

• Custom Prism® SureColor® Grout

• Custom ProLite® Rapid Setting Large Format Tile & Stone Mortar

• Custom Commercial 100% Silicone Caulk

Installer: Wirtz Quality Installations, Inc., San Diego, CA

Architect: Anshen+Allen Architects, San Francisco, CA

KEYWORDS: glass tile membrane porcelain tile stone installation stone tile

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • customer doing research online

    3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

    Your fabrication shop can have the best website. The best...
    Fabricator How-to
    By: Anthony Milia
  • Silica

    Renewed National Attention Ignites Over Silicosis Epidemic

    A major investigative report published on March 12, 2026...
    Industry Insights
    By: Jason Kamery
  • shipping containers

    U.S. Countertop Material Imports: February 2026

    U.S. countertop material imports collapsed in February...
    Stone
    By: Jason Kamery
Manage My Account
  • eMagazine
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Popular Stories

shipping containers

U.S. Countertop Material Imports: February 2026

Save Quartz Jobs Coalition Logo

ITC Moves Towards New Quartz Import Tariffs

cal osha

Cal/OSHA Standards Board to Vote May 21 on Engineered Stone Ban Petition

Fabricator Focus

From profiles to roundtable discussions, Q&As to best business practices, we're turning a focus on topics and challenges impacting fabricators.

AI Talk Is Everywhere -- Where Does a Countertop Fabricator Begin?

Fabricators Discuss Pros and Cons of Chip Repair

How to Grow a Countertop Fabrication Shop

Events

June 25, 2026

North Carolina Stone Summit

You’ve probably heard a lot lately about how to calculate the profit for each job you produce. You likely have production benchmarks based on square footage since it’s the most common production metric in the industry. Come learn how focusing on these metrics can hurt your profitability and what to do about it.

July 16, 2026

Washington Stone Summit

Join us for "Taking Your Organization to the Next Level," a session dedicated to transforming your business practices. Discover strategies for setting clear agendas, encouraging participation, and driving actionable outcomes. Learn how to foster collaboration and communication, ensuring that every meeting enhances productivity and contributes to your business goals.

View All Submit An Event

Poll

Tariffs and Quartz Imports

If high tariffs are placed on U.S. quartz imports, how will this affect your business?
View Results Poll Archive

Products

Restoration & Maintenance Technical Module

Restoration & Maintenance Technical Module

See More Products
	
3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

Related Articles

  • High-quality installation achieves posh hotel design

    See More
  • Lapitec-KBIS

    Lapitec Presents Latest Colors and Design Solutions at KBIS 2018

    See More
  • Grout Innovation Bolsters Hospital Project

    See More
×

Our Newsletters are a rock solid source of industry insights!

Stay in the know on the international stone and tile industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing