Stone World logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Stone World logo
  • NEWS
  • PRODUCTS
    • Machinery
    • Digital Technology
    • Tooling & Accessories
  • MATERIALS
    • Alternative Surfaces
    • Stone
    • Tile
    • Imports & Exports Data
  • FABRICATORS
    • Fabricator How-to
    • Fabricator Case Studies
    • Fabricator of the Year
  • A&D
    • Installation & Technical Tips
    • Outdoor Design
    • Interior Design
    • Hospitality | Commercial Design
    • Mosaics & Decorative Tile
    • Kitchen & Bath
    • Residential
    • Renovation | Restoration
  • MEDIA
    • Videos
    • Podcasts
    • EBOOK
  • EVENTS
    • STONE INDUSTRY EDUCATION
    • Industry Calendar
  • MORE
    • NEWSLETTERS
    • WOMEN SPOTLIGHT
    • MARKET RESEARCH
    • STONE WORLD STORE
  • DIRECTORY
    • TRADE ASSOCIATIONS
    • Stone Suppliers
    • GET LISTED
  • EMAG
    • eMagazines
    • Archives
    • Contact
    • Advertise
  • SIGN UP!

Bank upgrade relies on ashlar stonework

By Michelle Stinnard
April 12, 2007
The facade of the 13,000-square-foot Alta Alliance Bank headquarters building, located in Downtown Oakland, CA, features alternating stripes of black and Sand Beige dolomitic limestone in an ashlar pattern, which was added to update the look of the exterior facade.


Located in Downtown Oakland, CA, the facade of the 13,000-square-foot building that now houses the Alta Alliance Bank headquarters was in dire need of a facelift, and locally based RPR Architects came to the rescue in a timely manner. To enhance the outdated look of the exterior space, the architects added a variety of limestone and granite to the exterior facade of the building, and stone was also carried inside.

According to Design Principal Michael Perkocha, AIA of RPR Architects, the building was originally constructed in the 1950s, and remodeled in the 1970s. “The intent was to create a signature building for Alta Alliance Bank,” he said. “We wanted to give it a fresh contemporary look to attract customers and high-caliber employees.”

The exterior facade of the building features alternating stripes of black and Sand Beige dolomitic limestone - which was quarried in Indonesia - in a combination of bushhammered and split-faced finishes. The material was supplied by Im Ex Ware of Henderson, NV, and distributed by Dal-Tile Corp. of San Leandro, CA.

RPR Architects considered a number of stone finishes before ultimately selecting a combination of bushhammered and split-faced. “We wanted something very eye-catching in terms of colors,” said the architect. “The bushhammered and split-faced finishes are appealing for aesthetic reasons and are also less attractive to graffiti due to their very coarse textures. Stone was the right choice for the bank, as it made it seem solid and substantial.

“We knew we wanted a material that was contemporary but also distinctive - the image of the shiny granite corporate bank wasn’t right for Alta Alliance as a community-based bank,” the architect continued. “The limestone, in combination with the signature yellow metal canopy and fascia, had the right mix of warmth, solidity and brilliance.”

The pattern features a variety of random sizes that are 8 inches tall and anywhere from 4 to 24 inches wide. The stone was laid in an ashlar pattern and features pieces that are mainly 3/8 inches thick, although the split-faced material tends to be thicker at the edges of the building, according to Perkocha. “The stone was sealed with ProSoCo Limestone and Marble Protector to sharpen the contrast and enhance the color and veining of the natural stone veneer, while aiding with maintaining the crispness of the design,” he said. Perkocha also added that the exposed corners of the stone were all mitered, which he felt was a fairly unique aspect of the project.

Additionally, the base of the building is comprised of Absolute Black granite, which was also distributed by Dal-Tile Corp. The bottom 2 feet of the facade features 18- x 18-inch pieces of granite, while smaller 6- x 6-inch pieces were used around the automated teller area of the bank.



According to Design Principal Michael Perkocha, AIA of RPR Architects, the biggest challenge was in applying the stone veneer to an existing building with multiple substrates.

Installing the stone

According to the architect, the biggest challenge was in applying the stone veneer to an existing building with multiple substrates. “In some areas, we had to apply the veneer to a brick wall, and in other areas to a steel framing,” he said. “Another challenge was that with the ashlar pattern and random sizes of the stone, the material had to be laid up using some artistic interpretation on the part of the masons. The stone had to be carefully aligned so it maintained the random appearance of ashlar masonry.

“The General Contractor, South Bay Construction, coordinated the subcontractors on the job to assure De Anza Tile with access and a properly prepared substrate for the application of the random-length course stone,” Perkocha continued.

According to Rich Papapietro of De Anza Co., Inc. Tile of Palo Alta, CA, the stonework took approximately one month to install, with a total of four workers on the job. Using Megalite® Crack Prevention Mortar from Custom Building Products, the workers were able to adhere the stone panels to the facade of the building. “The lightweight product has a bond on it that is incredible,” said Papapietro.

The installer agreed with Perkocha that the different surfaces on the building posed a challenge when it came time to install the stone. “It was difficult going over all the different surfaces to try and achieve a level plane,” he said. “The material was feathered out in some places by the stucco workers and so forth which helped overcome this.” All the prep work paid off because the final monolithic appearance of the stone walls is exactly what the architect envisioned.

Natural stone was also carried inside the building, as slabs of Absolute Black granite were used for bathroom and kitchen countertops. This met the owner’s request that the interiors would be “warm and inviting, with an upscale comfortable atmosphere.” “We wanted to carry through the feeling of elegance and permanence that greets customers on the exterior,” the architect added.

The project was carried out in a timely manner, taking only six months to complete from start to finish. Finishing in January 2007, the project was very well received, according to the architect. “The project was done with some assistance from the Community and Economic Development Agency (CEDA) of Oakland,” he said. “Brian Kendall, the city’s project manager, said this bank is one of the most successful projects they have ever had in terms of the facade improvement program.”

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Michelle is the assistant editor of Stone World.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • customer doing research online

    3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

    Your fabrication shop can have the best website. The best...
    Fabricator How-to
    By: Anthony Milia
  • Silica

    Renewed National Attention Ignites Over Silicosis Epidemic

    A major investigative report published on March 12, 2026...
    Industry Insights
    By: Jason Kamery
  • shipping containers

    U.S. Countertop Material Imports: February 2026

    U.S. countertop material imports collapsed in February...
    Stone
    By: Jason Kamery
Manage My Account
  • eMagazine
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Popular Stories

shipping containers

U.S. Countertop Material Imports: February 2026

Save Quartz Jobs Coalition Logo

ITC Moves Towards New Quartz Import Tariffs

cal osha

Cal/OSHA Standards Board to Vote May 21 on Engineered Stone Ban Petition

Fabricator Focus

From profiles to roundtable discussions, Q&As to best business practices, we're turning a focus on topics and challenges impacting fabricators.

AI Talk Is Everywhere -- Where Does a Countertop Fabricator Begin?

Fabricators Discuss Pros and Cons of Chip Repair

How to Grow a Countertop Fabrication Shop

Events

June 25, 2026

North Carolina Stone Summit

You’ve probably heard a lot lately about how to calculate the profit for each job you produce. You likely have production benchmarks based on square footage since it’s the most common production metric in the industry. Come learn how focusing on these metrics can hurt your profitability and what to do about it.

July 16, 2026

Washington Stone Summit

Join us for "Taking Your Organization to the Next Level," a session dedicated to transforming your business practices. Discover strategies for setting clear agendas, encouraging participation, and driving actionable outcomes. Learn how to foster collaboration and communication, ensuring that every meeting enhances productivity and contributes to your business goals.

View All Submit An Event

Poll

Tariffs and Quartz Imports

If high tariffs are placed on U.S. quartz imports, how will this affect your business?
View Results Poll Archive

Products

Restoration & Maintenance Technical Module

Restoration & Maintenance Technical Module

See More Products
	
3 Reasons Why Quick Response Time Results in a Successful Fabrication Shop

Related Articles

  • High-end custom shop relies on waterjet

    See More
  • Campus-based transportation facility relies on granite

    See More
  • Landmark expansion relies on natural stone

    See More
×

Our Newsletters are a rock solid source of industry insights!

Stay in the know on the international stone and tile industry trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing