Bank upgrade relies on ashlar stonework

April 12, 2007
/ Print / Reprints /
ShareMore
/ Text Size+
The facade of the 13,000-square-foot Alta Alliance Bank headquarters building, located in Downtown Oakland, CA, features alternating stripes of black and Sand Beige dolomitic limestone in an ashlar pattern, which was added to update the look of the exterior facade.


Located in Downtown Oakland, CA, the facade of the 13,000-square-foot building that now houses the Alta Alliance Bank headquarters was in dire need of a facelift, and locally based RPR Architects came to the rescue in a timely manner. To enhance the outdated look of the exterior space, the architects added a variety of limestone and granite to the exterior facade of the building, and stone was also carried inside.

According to Design Principal Michael Perkocha, AIA of RPR Architects, the building was originally constructed in the 1950s, and remodeled in the 1970s. “The intent was to create a signature building for Alta Alliance Bank,” he said. “We wanted to give it a fresh contemporary look to attract customers and high-caliber employees.”

The exterior facade of the building features alternating stripes of black and Sand Beige dolomitic limestone - which was quarried in Indonesia - in a combination of bushhammered and split-faced finishes. The material was supplied by Im Ex Ware of Henderson, NV, and distributed by Dal-Tile Corp. of San Leandro, CA.

RPR Architects considered a number of stone finishes before ultimately selecting a combination of bushhammered and split-faced. “We wanted something very eye-catching in terms of colors,” said the architect. “The bushhammered and split-faced finishes are appealing for aesthetic reasons and are also less attractive to graffiti due to their very coarse textures. Stone was the right choice for the bank, as it made it seem solid and substantial.

“We knew we wanted a material that was contemporary but also distinctive - the image of the shiny granite corporate bank wasn’t right for Alta Alliance as a community-based bank,” the architect continued. “The limestone, in combination with the signature yellow metal canopy and fascia, had the right mix of warmth, solidity and brilliance.”

The pattern features a variety of random sizes that are 8 inches tall and anywhere from 4 to 24 inches wide. The stone was laid in an ashlar pattern and features pieces that are mainly 3/8 inches thick, although the split-faced material tends to be thicker at the edges of the building, according to Perkocha. “The stone was sealed with ProSoCo Limestone and Marble Protector to sharpen the contrast and enhance the color and veining of the natural stone veneer, while aiding with maintaining the crispness of the design,” he said. Perkocha also added that the exposed corners of the stone were all mitered, which he felt was a fairly unique aspect of the project.

Additionally, the base of the building is comprised of Absolute Black granite, which was also distributed by Dal-Tile Corp. The bottom 2 feet of the facade features 18- x 18-inch pieces of granite, while smaller 6- x 6-inch pieces were used around the automated teller area of the bank.



According to Design Principal Michael Perkocha, AIA of RPR Architects, the biggest challenge was in applying the stone veneer to an existing building with multiple substrates.

Installing the stone

According to the architect, the biggest challenge was in applying the stone veneer to an existing building with multiple substrates. “In some areas, we had to apply the veneer to a brick wall, and in other areas to a steel framing,” he said. “Another challenge was that with the ashlar pattern and random sizes of the stone, the material had to be laid up using some artistic interpretation on the part of the masons. The stone had to be carefully aligned so it maintained the random appearance of ashlar masonry.

“The General Contractor, South Bay Construction, coordinated the subcontractors on the job to assure De Anza Tile with access and a properly prepared substrate for the application of the random-length course stone,” Perkocha continued.

According to Rich Papapietro of De Anza Co., Inc. Tile of Palo Alta, CA, the stonework took approximately one month to install, with a total of four workers on the job. Using Megalite® Crack Prevention Mortar from Custom Building Products, the workers were able to adhere the stone panels to the facade of the building. “The lightweight product has a bond on it that is incredible,” said Papapietro.

The installer agreed with Perkocha that the different surfaces on the building posed a challenge when it came time to install the stone. “It was difficult going over all the different surfaces to try and achieve a level plane,” he said. “The material was feathered out in some places by the stucco workers and so forth which helped overcome this.” All the prep work paid off because the final monolithic appearance of the stone walls is exactly what the architect envisioned.

Natural stone was also carried inside the building, as slabs of Absolute Black granite were used for bathroom and kitchen countertops. This met the owner’s request that the interiors would be “warm and inviting, with an upscale comfortable atmosphere.” “We wanted to carry through the feeling of elegance and permanence that greets customers on the exterior,” the architect added.

The project was carried out in a timely manner, taking only six months to complete from start to finish. Finishing in January 2007, the project was very well received, according to the architect. “The project was done with some assistance from the Community and Economic Development Agency (CEDA) of Oakland,” he said. “Brian Kendall, the city’s project manager, said this bank is one of the most successful projects they have ever had in terms of the facade improvement program.”

Did you enjoy this article? Click here to subscribe to Stone World 

Recent Articles by Michelle Stinnard

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

November 2013 Stone Products Gallery

Take a look at some of the latest stone industry products.

THE MAGAZINE

Stone World Magazine

April 2014 stone world cover

2014 April

In this month's issue of Stone World, check out an extensive preview of Coverings 2014, which will be celebrating its 25th anniversary in April. Also learn more about various types of limestone that were used to build private residences.

Table Of Contents Subscribe

Contemporary Stone & Tile Design Magazine

CSTD_Spring2014_Cover.jpg

2014 Spring

This issue of Contemporary Stone & Tile Design includes our annual focus on Kitchen and Bath design

Table Of Contents Subscribe

Training Program

How formal is your training program for new employees?
View Results Poll Archive

The Stone World Store

How_To_Polish_&_Restore_Mar.gif
How to Polish & Restore Marble Flooring

This video will show you step-by-step how to resurface and polish marble flooring from grinding and removing lippage and scratches to achieving a highly reflective polish.

More Products

Italian Trade Commission Coverings exhibitor preview

Italian Trade Commission logo 2

The Italian Trade Commission is presenting a large group of the most innovative and internationally renowned Italian suppliers of dimensional natural stones. We hope your busy schedule will allow you to join us for a “genuine” espresso in booth N. 4045 and explore the exciting Italian natural stone resources offered by our exhibitors. Check out Italian stone producers exhibiting at Coverings 2014 here!

  

Stone Industry Education

stone industry educationStone Industry Education is sponsored by Stone World Magazine and Marble Institute of America. The SIE events will help you: strengthen your skills, build your business, and  increase profit in your shop.  Check out stoneindustryeducation.com to register for upcoming fabricator and installer seminars.

STAY CONNECTED

facebook logo Twitter  YouTube