For instance, cold weather installations may require tenting and temporary heat. Shielding an installation area from the wind is also a good idea. Windy conditions can cause the mortar to “dry out†prematurely, and will result in a drop off in strength of the mortars. If you couple that with high temperatures, even more challenges may result. This is why it is critical to shade the work areas or work during cooler periods of the day if high temperatures are in the forecast. These are just a few examples of climactic conditions that a seasoned installer will be able to tackle.
On the other hand, an installation that will be subjected to vehicular traffic may need between 14 to 28 days to reach the strength required at 70 degrees Fahrenheit (21 degrees Celsius).